Chip Sealing information

Chip and Fog Sealing programs consist of maintenance to prolong the life of selected streets.  These improvements include the following:

  1. Crack sealing the street
  2. Removing the street's edge berm to expose the entire surface of the road
  3. Applying the chip seal material to the street
  4. Sealing the newly installed chip seal with an emulsion fog spray
  5. Sweeping any loose stones

*Note: during the street's edge berm removal, a small section of yards along the street will be removed by equipment to totally expose the street surface and any damage to your yard will be restored following the completion of the project.


Mill and Fill Information

The City of Portage Street Mill and Fill Program consists of major maintenance to selected streets to enhance structural integrity and ride quality, as well as prolong the life of the street. These improvements include the removal of badly worn areas of the road and overlaying the surface with 1.5 inches of new asphalt.

Tac Coat Warning

Residents should be aware that a “tac coat” (oily substance) is sprayed on the street prior to paving in order to bond the new asphalt to the old surface.  Driving on the tac coat should be avoided as this material may attach to tires and vehicle undercarriages, and may be carried onto your driveway or garage floor.


General Program Information

Advanced Notification

Affected residents will be notified via an informational door hanger on the day prior to the scheduled construction for your specific street. 

One Lane Travel

One lane of travel will remain open during the resurfacing process.

  1. Chip Seal Schedule 2022
  2. Mill and Fill Schedule 2022
Street Name Chip Seal Date
Nash Avenue (Sprinkle Road - East Shore Drive) TBD - Expected July
East Shore Drive (Nash Avenue - Cox's Drive) TBD - Expected July
Autumn View Lane (Mandigo Avenue - Dead End) TBD - Expected July
Summer Avenue (East Dead End - West Dead End) TBD - Expected July
Woodhams Avenue (Woody Noll Drive - East Shore Drive TBD - Expected July
Gertrude Drive (Ramona Avenue to Dead End) TBD - Expected July
Lansing Avenue (Gertrude Drive - Portage Road) TBD - Expected July
Linneman Avenue (Ramona Avenue to Lansing Avenue) TBD - Expected July
Ramona Avenue (Portage Road - Lovers Lane) TBD - Expected July
Mandigo Avenue (Portage Road - Andrews Street) TBD - Expected July
Corporate Avenue (Bishops Avenue - Cul-de-sac) TBD - Expected July
Environmental Drive (South Sprinkle Road - Quality Way) TBD - Expected July
East Centre Avenue (South Sprinkle Road - City Limts) TBD - Expected July
Balmoral Street (North Dead End - South Dead End) TBD - Expected July
Biscayne Avenue (South Sprinkle Road - Balmoral Street) TBD - Expected July
Florinda Avenue (Balmoral Street - Windwood Street) TBD - Expected July
North Windwood Street (Florinda Avenue - Biscayne Avenue) TBD - Expected July
South Windwood Street (Biscayne Avenue - Pompano Avenue) TBD - Expected July
Pompano Street (South Sprinkle Road - Balmoral Street) TBD - Expected July
Holly Avenue (Schurr Street - Dead End) TBD - Expected July
Mapleview Avenue (Shaver Road - Schurr Street) TBD - Expected July
Schurr Street (Oakleaf - Dead End) TBD - Expected July
Sugarloaf Avenue (Shaver Road - Schurr Street) TBD - Expected July
Bacon Avenue (Portage Road - South Westnedge Avenue) TBD - Expected July
Oakland Drive (Shaver Road - West Osterhout Avenue) TBD - Expected July
Vanderbilt Avenue (Shaver Road - Oakland Drive) TBD - Expected July
West Melody Avenue (Shaver - South Westnedge Avenue) TBD - Expected July